Bridge Realization Estimate
ML model predicts what fraction of the bridge is achievable (accuracy: 60%, n=5,839)
Expected realization: 58% of modeled bridge. Strengths: Bed Count. Risks: Occupancy Rate, Revenue per Bed. Risk-adjusted uplift: $0.7M (vs $1.2M modeled).
EBITDA Bridge — 7 RCM Levers
Each bar shows the annual EBITDA impact at full run-rate. Revenue levers increase top-line; cost levers reduce operating expense; cash acceleration releases working capital. Calibrated to published research bands (Denial 12%→5% = $8-15M on $400M NPR).
Lever Detail
Each value shows its data source. SELLER = seller data room, DEFAULT = model default, BENCHMARK = P75 peer benchmark.
| Lever | Current | Target | Revenue | Cost | EBITDA | WC | Ramp |
|---|---|---|---|---|---|---|---|
| Cost to Collect | 4.5% DEFAULT | 2.5% BENCHMARK | $0 | $472K | $472K | $0 | 12mo |
| Denial Rate Reduction | 12.0% DEFAULT | 6.5% BENCHMARK | $454K | $13K | $467K | $0 | 12mo |
| A/R Days Reduction | 52.00 DEFAULT | 38.00 BENCHMARK | $72K | $215K | $287K | $905K | 9mo |
| Clean Claim Rate | 88.0% DEFAULT | 96.0% BENCHMARK | $0 | $15K | $15K | $0 | 6mo |
| Net Collection Rate | 93.5% DEFAULT | 51.1% BENCHMARK | $0 | $0 | $0 | $0 | 18mo |
| CDI / Case Mix Index | 135.0% DEFAULT | 142.0% BENCHMARK | $0 | $0 | $0 | $0 | 18mo |
Implementation Timing Curve
Linear ramp to full run-rate per lever. Month 0 = close date. Partners should expect 60-70% of total uplift realized by month 12.
| Lever | M0 | M3 | M6 | M9 | M12 | M18 | M24 | M36 |
|---|---|---|---|---|---|---|---|---|
| Cost to Collect | $0 | $118K | $236K | $354K | $472K | $472K | $472K | $472K |
| Denial Rate Reduction | $0 | $117K | $234K | $350K | $467K | $467K | $467K | $467K |
| A/R Days Reduction | $0 | $96K | $191K | $287K | $287K | $287K | $287K | $287K |
| Clean Claim Rate | $0 | $8K | $15K | $15K | $15K | $15K | $15K | $15K |
| Cumulative | $0 | $338K | $676K | $1.0M | $1.2M | $1.2M | $1.2M | $1.2M |
Returns Sensitivity (IRR / MOIC)
5-year hold, 5.5x leverage, 3% organic growth, 10%/yr debt paydown. Green = exceeds 20% IRR hurdle. Amber = 15-20%. Red = below hurdle or loss. RCM uplift of $1.2M is added at exit.
| Entry \ Exit | 9.0x | 10.0x | 11.0x | 11.5x | 12.0x |
|---|---|---|---|---|---|
| 8.0x | -100% / 0.0x | -100% / 0.0x | -100% / 0.0x | -100% / 0.0x | -100% / 0.0x |
| 9.0x | -100% / 0.0x | -100% / 0.0x | -100% / 0.0x | -100% / 0.0x | -100% / 0.0x |
| 10.0x | -100% / 0.0x | -100% / 0.0x | -100% / 0.0x | -100% / 0.0x | -100% / 0.0x |
| 11.0x | -100% / 0.0x | -100% / 0.0x | -100% / 0.0x | -100% / 0.0x | -100% / 0.0x |
| 12.0x | -100% / 0.0x | -100% / 0.0x | -100% / 0.0x | -100% / 0.0x | -100% / 0.0x |
Covenant Headroom (at 10x Entry, 6.5x Max Leverage)
Pro forma EBITDA can decline 2706% before the 6.5x covenant trips. RCM uplift reduces leverage from 99.0x to -169.4x, adding 268.4 turns of cushion.
5-Year Value Creation Waterfall
EBITDA trajectory: 3% organic growth + RCM uplift ramp (full run-rate at month 18).
| Base EBITDA | RCM Uplift | Total | Margin | |
|---|---|---|---|---|
| Entry | $-1.2M | — | $-1.2M | -5.0% |
| Year 1 | $-1.2M | +$828K | $-390K | -1.7% |
| Year 2 | $-1.3M | +$1.2M | $-13K | -0.1% |
| Year 3 | $-1.3M | +$1.2M | $-51K | -0.2% |
| Year 4 | $-1.3M | +$1.2M | $-89K | -0.4% |
| Year 5 | $-1.4M | +$1.2M | $-129K | -0.5% |
Achievement Sensitivity
What if we only achieve a fraction of each lever? 50% = conservative, 75% = base management case, 100% = plan, 120% = stretch.
| Lever | 50% | 75% | 100% | 120% |
|---|---|---|---|---|
| Cost to Collect | $236K | $354K | $472K | $566K |
| Denial Rate Reductio | $234K | $350K | $467K | $561K |
| A/R Days Reduction | $144K | $215K | $287K | $345K |
| Clean Claim Rate | $8K | $11K | $15K | $18K |
| Total | $621K | $931K | $1.2M | $1.5M |
Peer Context — Where This Hospital Sits
Key metrics vs 272 size-matched peers. Low percentile on margin/efficiency metrics = more room for improvement = larger bridge opportunity.
| Metric | Hospital | P25 | P50 | P75 | Percentile |
|---|---|---|---|---|---|
| Op Margin | -5.0% | -21.0% | -3.2% | 10.6% | P45 |
| Net-to-Gross | 24.9% | 23.2% | 32.9% | 51.1% | P30 |
| Occupancy | 7.2% | 23.4% | 50.7% | 71.5% | P6 |
| Rev/Bed | $482K | $335K | $561K | $1.1M | P41 |
| Exp/Bed | $506K | $371K | $533K | $1.2M | P47 |
Bridge Methodology
Coefficients calibrated to published research bands: denial 12%→5% = $8-15M on $400M NPR. Current metrics estimated from HCRIS public data and ML predictions. Target metrics set at P75 peer benchmarks with 60% gap closure assumption. Revenue levers use NPR × delta × avoidable share. Cost levers use claims volume × cost per reworked claim. Working capital from AR reduction is one-time cash (not included in recurring EBITDA). Returns assume 5.5x leverage, 3% organic growth, 10%/yr debt paydown.